Examples of
Graphical Outputs from
Model
Contour
of the BBWM (14KB).
Flowpath Tree of the EBB basin
(16KB).
Sky View
of the BBWM watershed (252KB).
Time View
of the BBEM watershed (91KB).
Dynamic Watershed Hydrologic Simulation Results:
2-D Dynamic Map of the EBB basin
(189KB).
2-D Dynamic Map of the WBB basin
(138KB).
3-D Dynamic View of the EBB basin
(149KB).
Calibration Results for the OWLS model:
5/1/89 - 6/1/89 in the EBB basin
(13KB).
10/15/89 - 11/28/89 in the EBB basin
(14KB).
Validation Results for the OWLS model:
3/27/90 - 4/25/90 in the EBB basin
(14KB).
2/26/91 - 3/29/91 in the EBB basin
(15KB).
5/1/89 - 6/1/89 in the WBB basin
(13KB).
10/15/89 - 11/28/89 in the WBB basin
(14KB).
3/27/90 - 4/25/90 in the WBB basin
(14KB).
2/26/91 - 3/29/91 in the WBB basin
(15KB).
Extended Simulatioin Results:
Different Watershed Subdivision
(11KB).
Different Simulation Time Steps
(12KB).
This site is developed & maintained by
Dr. Wilson H. Chen
©
Copyright
by Wilson H. Chen, Dec. 1996, All Rights Reserved.